Short answer

San Jose requires no parking for an ADU and no replacement of covered parking removed for one. On the state-law single-family existing-space path, an accessory structure may add up to 150 sq ft only for ingress and egress.

Last verified 2026-10-18. Rules change; the City of San Jose ADU Ally team has the final word (408-793-5302).

Check your lot · free

What the San Jose rules allow on your lot: setbacks, the biggest unit that fits, fees.

Free. No credit card required. The City of Sacramento, the City of San Jose, unincorporated Sacramento County, the City of Los Angeles, the City of Citrus Heights, the City of Elk Grove, the City of Folsom, the City of Rancho Cordova, the City of San Diego and the City of El Monte for now; other areas get a partial check.

Design your ADU · free

Shape it in live 3D: size, rooms, roof and finishes, with an estimate priced for San Jose.

Start designing

The rules

ParkingLocal rule
None, and no replacement for a garage or carport you convert or removeSan Jose Municipal Code 20.80.175 I
Impact-fee exemptionLocal rule
ADUs of 750 sq ft or lessADU Universal Checklist (Bulletin 210), question 17
City building permit feeLocal rule
$3,291 up to 750 sq ft; $5,103 for 751-1,200 sq ft (base fee, before taxes)Published rate, not a quote for your project: an estimate until the agency confirms it.FY 2026-27 Building Division Fee Schedule (effective Aug. 10, 2026), p.3
Setback for an existing-space conversionState law
No new setback for an existing structure, or one rebuilt in the same place and dimensions, converted to an ADUGov. Code 66314(d)(7)
Replacement parking for a converted garageState law
No replacement parking required for spaces removed or converted for an ADUGov. Code 66314(d)(11)
Detached-garage demolition permitState law
If a detached garage is replaced with an ADU, its demolition permit is reviewed with the ADU application and issued at the same timeGov. Code 66314(e)
Entry and exit expansion for an existing-space ADUState law
On a single-family lot, an existing accessory structure may expand by up to 150 sq ft beyond its dimensions, only to accommodate entry and exitGov. Code 66323(a)(1)(A)
Fire sprinklers on the state pathState law
An ADU or junior ADU does not need sprinklers when the primary residence does not require themGov. Code 66323(d)

What to know in San Jose

The published permit charge is a base fee

The City's FY 2026-27 Building Division schedule puts ADUs under New/Alteration and lists issuance, plan review and inspection amounts. The base building permit fee shown above is before taxes, so it is not a total fee estimate for a particular conversion.

San Jose FY 2026-27 Building Division Fee Schedule, p.3

Estimated cost and rent

TypeEst. all-in costEst. rent
Garage conversion$268-$436 per sq ft of garage (about $107,000-$174,000 for a 400 sq ft garage)$1,850-$2,650/mo

Estimates for a first conversation, not bids or appraisals. Source: LotUpside price book sj-2026-10.

What we couldn't confirm

  • Whether the existing garage meets San Jose's building and fire requirements for a conversion is not confirmed here.
  • The total permit and school-district charges for this garage are not confirmed by the cited schedules.

Ask the City of San Jose ADU Ally team before you rely on these.

Check your lot free

Our free check reads your lot against the San Jose rules above from public records: a screening, not a permit or professional advice.

Free. No credit card required. The City of Sacramento, the City of San Jose, unincorporated Sacramento County, the City of Los Angeles, the City of Citrus Heights, the City of Elk Grove, the City of Folsom, the City of Rancho Cordova, the City of San Diego and the City of El Monte for now; other areas get a partial check.

Or design your San Jose ADU in 3D, free.

Floor plans to start from

Measured ADU layouts you can edit and download as CAD files, then check against the San Jose rules above.

Ready to build in San Jose?

We'll match you with a licensed designer and builder in your area and coordinate the project. Free consult, no obligation.

Want to build it?

We'll match you with a licensed designer and builder in your area and coordinate the project. Free consult, no obligation.

Licensed partner designers and builders do the design and construction, and the builder holds the construction contract. Partners are signed in some areas so far; elsewhere we'll tell you plainly what we can do.

San Jose garage conversion questions

Must I replace parking when I convert a San Jose garage?

No. San Jose Municipal Code 20.80.175 I requires no parking for an ADU and no replacement of covered spaces removed for it. Government Code 66314(d)(11) also bars replacement parking for a garage or carport converted to an ADU.

Does a San Jose garage conversion need a new side setback?

Government Code 66314(d)(7) requires no new setback for an existing accessory structure converted to an ADU. San Jose's Bulletin 210 says a zero side or rear setback must still meet building and fire requirements.

What if I remove a detached garage and put an ADU there?

Government Code 66314(e) says the demolition permit for a detached garage that will be replaced by an ADU is reviewed with the ADU application and issued at the same time. San Jose's Building Division Fee Schedule lists the ADU building permit charge separately.

Is this a permit, or a plan I can build from?

Neither. It is a screening from public records, not professional advice, and not a survey, soils report, appraisal, loan offer or permit; every number is an estimate. A licensed designer confirms the final plan, and your city or county gives final approval.

More about ADUs in San Jose

Garage conversion in other areas

Send us feedback

Something confusing, broken or missing? Tell us.