Add an ADU to your San Diego home

LotUpside is a one-stop ADU company for homes in the City of San Diego: we check your lot free against the city's rules, then match you with licensed designers and builders and coordinate the project with them.

Check your lot · free

What the San Diego rules allow on your lot: setbacks, the biggest unit that fits, fees.

Free. No credit card required. The City of Sacramento, the City of San Jose, unincorporated Sacramento County, the City of Los Angeles, the City of Citrus Heights, the City of Elk Grove, the City of Folsom, the City of Rancho Cordova, the City of San Diego and the City of El Monte for now; other areas get a partial check.

Design your ADU · free

Shape it in live 3D: size, rooms, roof and finishes, with an estimate priced for San Diego.

Start designing

ADU rules at a glance

Largest detached ADULocal rule
1,200 sq ftSan Diego Municipal Code 141.0302(b)(7)(B)
Size state law allowsState law
At least 800 sq ft, with 4 ft side and rear setbacksCalifornia Government Code 66321(b)(3)
Side and rear setbacks (ADU up to 16 ft tall)Local rule
0 ft outside High and Very High fire zones, 4 ft insideSan Diego Municipal Code 141.0302(b)(9)(C)
Front setbackLocal rule
The zone's front setback; one ADU of 800 sq ft or less may go into itSan Diego Municipal Code 141.0302(b)(9)(A) and (b)(4)
ADUs per single-family lotLocal rule
2 ADUs (one inside the house or an existing outbuilding) plus 1 junior ADUSan Diego Municipal Code 141.0302(b)(1) and (c)(1)
Development Impact FeesLocal rule
Waived on the first two ADUs, at any size up to the 1,200 sq ft capSan Diego Municipal Code 142.0640(b)(1)(A)
School feesLocal rule
Due on ADUs and junior ADUs; $5.38 per sq ft in San Diego UnifiedSan Diego Unified School District developer fees (from May 10, 2026); City Information Bulletin 400
City plan check and inspection (base rates)Local rule
$8,085.26 base plan check + $8,401.90 base inspection for a detached ADU over 500 sq ftCity of San Diego Information Bulletin 501 (August 2026), Table 501A
Parking, new or replacing a converted garageLocal rule
None; in the Beach Impact Area outside transit priority areas one space may be requiredSan Diego Municipal Code 141.0302(b)(10)
Owner lives on siteLocal rule
Not required for an ADU; required with a junior ADUSan Diego Municipal Code 141.0302(b)(11) and (c)(1)(E)
Permit decision deadlineState law
60 days from a complete applicationCalifornia Government Code 66317(a)(3)
Pre-approved ADU plansLocal rule
County, Chula Vista and Encinitas plans accepted; 30-day reviewCity of San Diego Development Services, ADU/JADU page
Who answers ADU questionsLocal rule
City of San Diego Development Services DepartmentCity of San Diego Development Services, ADU/JADU page
Coastal Overlay ZoneLocal rule
Coastal Development Permit needed unless the ADU stays inside the house's existing living spaceCity of San Diego Information Bulletin 400 (January 2026)
City fire hazard mapLocal rule
Adds areas the State's map doesn't rate Very High (in effect since Aug. 30, 2025)City of San Diego Fire Hazard Severity Zone Map (Ordinance O-21992)

Last verified 2026-10-15. Rules change; the City of San Diego Development Services Department has the final word.

What's different in City of San Diego

No side or rear setback outside fire zones

An ADU 16 ft tall or less can go up to the side and rear lot lines unless the lot is in a High or Very High Fire Hazard Severity Zone, where it keeps 4 ft. A taller ADU next to a residential lot keeps 4 ft (or the zone's smaller setback), and building and fire codes can still require more distance from a lot line.

San Diego Municipal Code 141.0302(b)(9)(C) and (D)

Impact fees waived, school fees still due

San Diego waives its Development Impact Fees on the first two ADUs on a lot, whatever their size, unless they are over 750 sq ft and built with a Senate Bill 9 two-home project. School fees still apply to ADUs and junior ADUs at the school district's rate, and so do the City's building permit fees.

San Diego Municipal Code 142.0640(b)(1)(A); City Information Bulletin 400 (Fees)

Coastal lots need a Coastal Development Permit

In the Coastal Overlay Zone, an ADU needs a Coastal Development Permit unless it is carved out of the house's existing living space. In the zone's non-appealable area the City can issue it with the building permit, and several recent City ADU amendments don't apply in the zone until the Coastal Commission approves them.

City of San Diego Information Bulletin 400 (Coastal Development Permit Requirement)

The City's own hazard maps

If the City's Seismic Safety Study maps put the lot in one of the fault, landslide, liquefaction or coastal bluff categories Table 145.1803(1) lists for homes, a new ADU needs a geotechnical report before the building permit; the Building Official may waive it in some cases. The City's own fire hazard map, in effect since Aug. 30, 2025, adds areas the State's map doesn't rate Very High, and an ADU in a High or Very High zone keeps 4 ft from side and rear lot lines.

San Diego Municipal Code 145.1803 and Table 145.1803(1); City of San Diego Fire Hazard Severity Zone Map (O-21992)

Pre-approved ADU plans from nearby agencies

The City accepts the County of San Diego's and Chula Vista's standard ADU plans and Encinitas' permit-ready ADU plans, and permit applications that use them get a 30-day review. You license a plan from its provider, and it still has to meet San Diego's development rules and current building codes.

City of San Diego Development Services, ADU/JADU page (Preapproved ADU Plans)

Estimated costs and rents in City of San Diego

TypeEst. all-in costEst. rent
Garage conversion$232-$377 per sq ft of garage (about $93,000-$151,000 for a 400 sq ft garage)$1,750-$2,525/mo
Junior ADU (inside the house)$85,000-$160,000$1,500-$1,900/mo
Detached studio$206,000-$303,000$1,750-$2,250/mo
Detached 1 bedroom$281,000-$413,000$2,150-$2,750/mo
Detached 2 bedroom$255,000-$460,000$2,500-$3,350/mo
Detached 3 bedroom$295,000-$484,000$3,175-$4,025/mo

Estimates for a first conversation, not bids or appraisals. Source: LotUpside price book sd-2026-10. Provisional estimate: rent, build-cost and value figures come from San Diego price lists and City fee schedules and have not yet been checked against a local builder's quote. They are not quotes, bids or appraisals.

How we work in City of San Diego

  1. 1

    Free lot check

    A 12-check property screening from public records: what fits on your lot and what it adds.

  2. 2

    Get matched with a licensed designer

    Ask for a free consult and we look for a licensed designer for your plans and permit.

  3. 3

    Get matched with a licensed builder

    The builder holds the construction contract; we coordinate the project with them.

Licensed partners design and build, and the builder holds the construction contract. Partners are signed in some areas so far. All figures are estimates, not bids.

What our check reads in City of San Diego

Rules from City of San Diego ADU ordinance (SDMC 141.0302) and City of San Diego Information Bulletin 400; zoning from the City of San Diego Official Zoning Map, CA Gov. Code 66314. Plus county parcel and assessor maps, CAL FIRE fire zones, FEMA flood maps, the California Geological Survey, the USDA soil survey, USGS elevation and Microsoft building outlines.

San Diego rents and build costs are provisional: price lists and City fee schedules, not yet checked against a local builder's quote. Coastal, planned-district and overlay lots stop at 'needs a closer look'.

City of San Diego ADU questions answered

Floor plans to start from

Measured ADU layouts you can edit and download as CAD files, then check against the San Diego rules above.

Ready to build in San Diego?

We'll match you with a licensed designer and builder in your area and coordinate the project. Free consult, no obligation.

Want to build it?

We'll match you with a licensed designer and builder in your area and coordinate the project. Free consult, no obligation.

Licensed partner designers and builders do the design and construction, and the builder holds the construction contract. Partners are signed in some areas so far; elsewhere we'll tell you plainly what we can do.

City of San Diego ADU questions

How tall can an ADU be in San Diego?

As tall as the lot's base and overlay zones allow, and no more than two stories on lots zoned for a single home, under San Diego Municipal Code 141.0302(b)(8). State law (Government Code 66321(b)(4)) requires the City to allow at least 16 ft for a detached ADU, or 18 ft within a half-mile walk of major transit.

Can I turn my garage into an ADU in San Diego?

Yes, outside the Coastal Overlay Zone conditions (in that zone the structure must also meet the coastal rules of 141.0302(a)(7) and needs a Coastal Development Permit). An ADU built inside an existing garage or other accessory structure keeps that structure's setbacks, has no size cap and may add up to 150 sq ft for getting in and out, under San Diego Municipal Code 141.0302(a)(5) and (b)(7)(D). The lost parking doesn't need replacing unless the lot is in the Beach Impact Area outside a transit priority area (141.0302(b)(10)(C)).

Can I rent a San Diego ADU as a short-term or vacation rental?

Not an ADU: San Diego Municipal Code 141.0302(a)(8) bars rental terms shorter than 31 consecutive days. The code sets no term for a junior ADU, but the City's ADU page and Information Bulletin 400 apply the same rule to junior units, so plan on rentals of a month or longer.

Can I sell an ADU separately from the house in San Diego?

Yes. San Diego lets owners turn a new or existing ADU into a condominium and sell it separately, following the subdivision steps in San Diego Municipal Code 141.0302(f). ADUs built through the City's ADU Home Density Bonus program can't be sold separately, according to the City's ADU page, and a junior ADU never can (141.0302(c)(1)(D)).

What's free, and what's in the $49 full report?

The free check gives the verdict from a 12-check property screening, your best move with the value it adds, the monthly rent and the cash you put in. The full report adds every option ranked, cost vs value ranges, concept floor layouts and site plan drafts, and every check with its sources. It is a one-time payment per property.

Is this a permit, or a plan I can build from?

Neither. It is a screening from public records, not professional advice, and not a survey, soils report, appraisal, loan offer or permit; every number is an estimate. A licensed designer confirms the final plan, and your city or county gives final approval.

Other areas we cover

Free. No credit card required. The City of Sacramento, the City of San Jose, unincorporated Sacramento County, the City of Los Angeles, the City of Citrus Heights, the City of Elk Grove, the City of Folsom, the City of Rancho Cordova, the City of San Diego and the City of El Monte for now; other areas get a partial check.